Project Overview:
The total construction area of Huoshenshan Hospital is 33,900 square meters, with 1,000 beds designed. It is one of the two major centralized treatment hospitals for the novel coronavirus, modeled after the Beijing Xiaotangshan Hospital during the SARS outbreak in 2003. The wastewater treatment system is also based on the Xiaotangshan Hospital, proposing an upgraded treatment model with a designed treatment capacity of 1,000 tons per day, covering an area of 780 square meters.
Key features: 1. Dual system operation to ensure system resilience; 2. Multiple levels of disinfection to ensure the elimination of bacteria; 3. Dual disinfection systems as backups to provide a backup solution for liquid chlorine disinfection; 4. Comprehensive equipmentization of the overall process.
Treatment capacity: 2,000 m³/d
Outflow indicators: Standards in Table 1 of the "Medical Institution Water Pollutant Discharge Standard" (GB18466-2005)