Case Studies

Case Studies

3,000+ Successful Cases Nationwide, Demonstrating Yinjiang's Excellence

Beijing Xihu Underground Channel Integrated Sewage Treatment Project

北京西護暗溝一體化汙水處理項目
Beijing Urban Distributed Sewage Treatment & Upgrade
KtCQ

Beijing Xihu Underground Channel Integrated Sewage Treatment Project

Scale: 10,000m³/d Sewage Treatment Capacity

Project Overview: This project is located in Xicheng District, Beijing, at the mouth of Xibianmen River, 240 meters north of Tianning Temple Bridge, and on the south side of Guang'anmen North Riverside Road No. 4. There are two 5000×4500mm rainwater square channels in the west drainage culvert. In the early rainy season, rainwater directly flows into the west city wall river, carrying pollutants such as sediment and floating debris, which affects the water quality. To improve the water quality of the rainwater entering the river and reduce river pollution, an integrated treatment device is added at this location. Through the integrated equipment, most of the SS (suspended solids) and total phosphorus in the water body are reduced, while some insoluble COD in the water body is removed, improving the water quality of the outflow from the river mouth and enhancing the overall water environment. 
Equipment type: KtCQ-1000 
Project location: Xiannanmen Weir River Mouth, Xicheng District, Beijing 
Project scale: Sewage treatment capacity 10,000 cubic meters per day 

Construction period: December 2021


Project renderings:



Project Photos: